News and Case Studies - Central Flooring Services Ltd
 call us now 0116 275 0315
You are here: Home > News > Velodrome, Olympic Park

Velodrome, Olympic Park

03/06/2013

velodrome1.jpgCentral Flooring Services have just completed a 600m2 concourse at the Olympic Park Velodrome.

The specification called for the grinding of the existing concrete followed by the installation of a new resin flooring system with high durability and aesthetics.

Once the floor had been fully ground and vacuumed all cracks and chips were repaired with an epoxy repair mortar and then coated with 2 coats of Sika 264 epoxy high build coating.


To provide a high aesthevelodrome2.jpgtic look a further clear matt coat of Sika 365N was applied.

The project was completed for part of legacy works to change the Olympic Village into the Queen Elizabeth Park. After a rigorous selection process Central Flooring Services Ltd were chosen due to their experience and quality of work. 

velodrome3.jpgThe legacy committee, which is overseen by Lord Coe and the Mayor of London, worked with Central Flooring Services for the product and colour choice and were responsible for inspecting the project for signing off, so it was critical to for the job to be of a high standard.




velodrome4.jpgA full ITP (inspection and testing programme) quality procedure was produced to ensure the completed project was handed over to a completely satisfied client with no defects.